In this post I will certainly explain the regular basic needs of an audio, modern-day high stress, straight setup. If you need detail, then I suggest that you have a look at the web site (). For any person looking for, obtain in touch with your local plumbing organisation. The adhering to summary connects to a modern-day high pressure (400/600Kpa) system normally made by Kwikot South Africa.

geyser installationgeyser installation


Much less usual are old reduced stress systems (100kpa) open pipe or "Latco" kind systems. Know that the parts are NOT compatible in between the 2 distinctive systems - High stress as well as Reduced pressure! It is feasible to get rid of an old low stress system and replace it with a modern-day high pressure system nonetheless - you get a brand-new high stress hot spring and install it according to the existing requirements.



The geyser rests in a tray made of plastic (usually red) or tin plate. I prefer the plastic ones.

Because June 2001, the drip tray is not optional - its reached exist and there needs to be a drainpipe pipe for it! The drain is a 50mm PVC waste pipeline that drains the tray by piping the water out your house. I have actually seen many drip trays mounted without drains pipes! If your setup pre-dates June 2001 you may wish to get a plumber to check out it.

The Of Geyser Installation

The following most visible feature would be the. These are tiny brass components mounted at the end of a 30cm length of pipe. Both vacuum cleaner breakers stand up and down regarding 30cm over the geyser. These are essential, as they quit water siphoning out the geyser when the cool supply is stopped.

It can be argued that this is the key function, but I do not see it. Bear in mind that vacuum cleaner breakers are a fairly new need - there are still countless old HP systems available without vacuum cleaner breakers and I am yet to see one collapse. Just because I haven't seen it does not mean it's not happening! It is also more probable to happen in a multi-story structure since the siphon can attract an extra effective vacuum.

The chilly water side is the side that directly links to the drain dick as well as gets in the hot spring near the bottom. After the shut off valve you would typically find a Stress Control Valve (PCV). There are a number Resources of different kinds, mainly made of brass yet some are constructed from plastic.

This is where the PCV releases stress and also this is the pipeline that often drips. Do not stress if you can not find the PCV alongside the hot spring - it may be totaled 10 metres away, commonly in an extra obtainable put on a wall surface outside. Occasionally it's in a little plastic box outside.

The Only Guide to Geyser Installation

This valve must have a metal (copper or steel) pipeline connected to it as well as the pipe must lead straight out the structure. This vent pipeline is an essential safety and security function of the entire system.

The T&P shutoff is the least optional element - it needs to be there! - The weight of the hot spring must be appropriately supported on the roofing trusses - a minimum of 2 supports under the 'feet' of the hot spring. If it looks unstable get a plumber to inspect it out.

This was not a need on old hot springs, but it is now as well as it's worth fitting one. The geyser has to be earthed! I have actually seen many hot springs with the planet wire inapplicable. All the copper pipes have to likewise be earthed and adhered to the geyser earth. This is not a trivial precaution! Obtain a certified electrical contractor to inspect your installment if the bonding is missing or looks dodgy.


Once more, these are typically just left existing following to the geyser. There are essentially just two main thermostat kinds - the modern-day round "Kwiktherm" in newer Kwikot geysers and the VK (rectangle-shaped block) kind in older geysers and in some more recent non-Kwikot systems. The hot spring may be fed (cold water) with polcop (plastic) pipeline - approximately the shut down shutoff, yet the pipeline into and also out of the geyser need to be copper or you can check here galvanized steel.

Geyser Installation for Dummies

geyser installationgeyser installation


The warm water side must be copper, steel or accordingly rated (70) plastic or composite pipe. Keep in mind that you should have at least 1m of copper/steel pipeline out the geyser - you might not link plastic (composite) pipeline directly to the geyser. As above, the PCV and T&P have to be made from copper or steel - particularly the air vent out of the T&P valve.

geyser installationgeyser installation


I have actually seen a variety of installments where check here the installer has just run a brief length of 22mm copper into the drip tray with the concept being that the T&P can air vent directly right into the drip tray. A suggestion due to the fact that the warm (100 +) water/steam melts the drip tray and the PVC drainpipe pipeline.

The PCV is normally over the hot spring and also the cool water moves down into the hot spring. This is fairly vital due to the fact that it creates an anti-syphon loop that prevents the geyser from draining back via the inlet in the occasion of a supply of water failure. If you obtain hot water coming out your cold taps when the water supply falls short after that this is not working correctly.

Report this wiki page